X
This website uses cookies to ensure you get the best experience on our website. By continuing to use this website, you consent to our use of these cookies.

Senior Lot Construction

What, the Senior lot is GONE? That is right. JHL took over the senior lot during the week of spring break 3/13/23 - 3/17/23 and was quick to get the area fenced off and isolated. Demo of the parking lot was completed the week of spring break which kicked off excavation operations. 
Excavating to the bottom of the hole took about 7 days. The bottom of the excavation is roughly 12-14 feet deep and spoils are being staged off to the side. No JHL is not using it to build Mullen a skiing mountain, the majority of those spoils will be used to backfill the hole once the water detention system is installed. Currently, JHL is in the middle of installing water retention chambers. This particular system is self-percolating similar to a French drain but with layers. The base layer is a woven fabric topped with angular stone, chambers are then placed on top and snapped in place.  There is a total of 8 chambers, once installed they will be completely covered by angular stone and wrapped in woven fabric.  JHL is looking to have all chambers set and wrapped by the end of the week. Stay tuned Mustangs for the next construction update!
Back
No comments have been posted